20MWe Short Term Operating Reserve Rollout

STOR and Triad Flexible Power Generation

Each project required the installation of CHP diesel engines made up of 48 engines per 20MW power per site, for power grid balancing.

ESF Energy, with their development partner, prepared the business model as well as the project teaser and Information Memorandum.

ESF Energy Structured the project and successfully raised debt funding for 7 sites.